June 2025 : Functional Prototype Live ✅
First fully integrated Revoltamp system installed and operational at the founder’s residence.
Collected baseline performance data on charge/discharge efficiency, energy throughput, and initial time-of-use (TOU) savings calculations.
Validated hardware safety, enclosure design, and BMS communication performance under real operating conditions.
July–September 2025 : Go-to-Market Foundation & Investor Readiness
Developed comprehensive pitch deck covering problem, residential market analysis, solution architecture, roadmap, and use of funds.
Refined value proposition: ~60% lower installed cost compared to traditional systems and ~60% homeowner bill savings through AI-optimized TOU scheduling.
Strengthened residential focus on blackout-prone, high-tariff U.S. regions (Northeast, California, Texas, Florida).
Conducted early conversations with potential installation and solar integration partners.
October 2025 : Ecosystem & Supply Chain Development
Received continued guidance and warm introductions from Ben Franklin Technology Partners.
Met with NextFab Ventures to align on engineering best practices and hard-tech commercialization strategy.
Finalized key supplier partnerships for inverters, BMS, and electrical components to ensure long-term reliability and consistent supply chain performance.
Began identifying and applying for grant and early-stage non-dilutive funding opportunities to support pre-UL pilot systems (non-saleable units for testing and data gathering).
November 2025 : Community Engagement & MVP Execution
Prepared to attend the Wharton Energy & Climate Conference (November 7) to engage with investors, policymakers, and clean-energy innovators.
Continued progress on MVP build, integrating finalized technical specifications and performance benchmarks.
Initiated internal testing and quality validation plan for MVP assembly.
November–December 2025 : Engineering & Data Readiness
Finalized SDK/API integration plan for inverter connectivity, enabling app-level communication and TOU/weather-based optimization.
Continued MVP hardware and software development aligned with UL certification standards.
Drafted MVP functional testing plan to evaluate system performance in daily-use conditions prior to pilot deployment.
Designed pilot deployment framework including traceable data metrics (efficiency, uptime, cost savings, degradation rate) to enable continuous product improvement before UL certification.